Papanui Parallel cycleway consultation

Location: St Albans Community Centre, 1047 Colombo St
Time: November 11 3.30pm – 6pm, with presentation at 5pm.
Description: Find out about the changes planned in St Albans – cul de sac in Trafalgar St, car park removal, tree removal, cycle track route and so on in the Papanui Parallel. Christchurch City Council has organised this consultation meeting so be sure to have your say. Presentation at 5pm.

About belinda

Involved with St Albans Community Resource Centre and NeighbourNet since 1997
This entry was posted in Uncategorized. Bookmark the permalink.
US