Patient Geraldine Street residents and their puzzled visitors will be shouting hooray now infrastructure repair work on the wastewater pipes in their street has finished.
There may be repairs in future but if so they are likely to be minor and not require detours.
Work on the pipes was carried out by Fletchers.